fxDreema

    • Register
    • Login
    • Search
    • Back to the main page
    • Categories
    • Recent
    • Tags
    • Popular
    • Search

    Add Costs to BEP

    Questions & Answers
    2
    2
    770
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • L
      lguarda last edited by

      Hi,

      Is there a possibility to add the Costs to a BEP? For example, let´s say that the cost os a operation are 2 PIPs, can I add something so the BEP point sets +2 PIPs instead of 0 PIPS?

      Thanks.

      1 Reply Last reply Reply Quote 0
      • C
        casebefx last edited by

        BEP offset mode set to "pips offset".
        And there is Break Even Point offset.

        1 Reply Last reply Reply Quote 0
        • 1 / 1
        • First post
          Last post

        Online Users

        G
        K
        P
        M
        M
        E
        Y

        27
        Online

        146.7k
        Users

        22.4k
        Topics

        122.6k
        Posts

        Powered by NodeBB Forums | Contributors